One non-stick soup pot mold was completed. Customer did not have accurate drawings, but we completed the total shape of the pot according to the customer’s draft drawing and support customer by 3D, its easy to check drawing and dimension. This time only took 2 days, and then provided it to the customer for confirmation. The customer was satisfied and confirmed the structure, Tang Sheng It takes 40 days to complete mold development to manufacturing and sample delivery confirmation. At present, the customer confirms OK and the mold can be sent to the customer. We will put oil for inside of the mold and paint the outside to protect it. And arrange transportation for customers, saving time and cost for customers.
Welcome to check more molds for non-stick cookware pots. ↓